GIFFIN AWARDED THE FCA D2AP MACK AVENUE NEW PAINT SHOP PROJECT IN DETROIT, MI
FCA D2AP – WL – Mack & St. Jean Detroit, Michigan – New Paint Shop
D2AP Stats:
- Grand Cherokee
- Process Envelope of 205” L x 88” W x 72” H
- Total Paint Shop is 790,500 Square Feet
- 1st Floor – “0 level “- 411,000 sq. ft.
- 2nd Floor – “32’ Level” – 275,500 sq. ft.
- Penthouse – “75’ Level” – 94,500 sq. ft.
- Sub Station, Paint Mix & Sludge Rooms – 9,500 sq. ft.
- 299 Caissons w/ 120” Ave Depth
- 11,868 CY of Concrete (Foundations)
- 30,000 CY of Concrete (Walls/Floors)
- 6,500 Tons of Structural Steel
- 1,800 Tons of Re-steel
- 86 Total Robots
- 4 Ovens (2 Dual Pass and 2 Single Pass)
- Paint Circulation consists of a Two-Pipe Hydraulically Balanced Graduated System with Temperature Control
- Total of 14 Paint Mix Systems
- 680 Carriers in the System
- 16 Vertical Drop Lifters
- 75 Overhead Carriers through Phosphate/E-Coat System with 2 Fork Transfers
- 2 Cranes with 136 Body Storage in the (Automatic Skid Retrieval System (ASRS)
- All new equipment